Knockdown rebuild

Keep the street you love. Build the home you want.

A knockdown rebuild replaces an older house with a new custom home on the same lot. We handle every step, from the survey and demolition to permits, construction and keys, with one point of contact: Sami.

Knockdown rebuild
Design and approvals
Usually 3 to 6 months
Demolition
2 to 4 weeks, once permits are in
Construction
Under 12 months, permit to keys
Typical total
About 15 to 20 months
Your contact
Sami Rafeeh, President
Pricing
Line by line, before you sign

Why rebuild

Same address. A better home.

For many GTA families the lot is the best part of the house: the street, the schools, the neighbours. Rebuilding keeps all of that and replaces what doesn’t work.

  • A floor plan designed for how you live, not how people lived in 1955
  • A new foundation, envelope and systems, built to today’s code and energy standards
  • Often simpler than gutting an old house, with fewer surprises behind the walls
  • Room for a basement or garden suite for family or rental income
  • One contract and one contact from demolition to keys

The process

From demolition to keys.

Each step ends with something in your hands, so you always know what you’re deciding and what comes next.

  1. Week 1

    Lot Check and site visit

    We review the zoning and walk the lot with you: setbacks, height, trees, grading and services.

    You receiveA one-page Lot Check and a budget range

  2. Weeks 2 to 6

    Survey, arborist and zoning review

    A topographic survey, an arborist report where trees are protected, and a zoning review of the concept.

    You receiveThe facts your design is built on

  3. Months 1 to 4

    Design and pricing

    Concept plans and 3D views, then a line-by-line proposal reviewed with you item by item.

    You receiveYour plans and a detailed proposal

  4. Months 3 to 6

    Permits and approvals

    Building and demolition permits, plus Committee of Adjustment, tree or conservation approvals if your lot needs them.

    You receiveYour building and demolition permits

  5. Before demolition

    Disconnect and survey

    Gas, hydro and water disconnections, and a designated substances survey for asbestos and other hazards common in older homes.

    You receiveA safe site, ready to clear

  6. 2 to 4 weeks

    Demolition

    The old house comes down, materials are recycled where possible, and the site is graded and fenced.

    You receiveA cleared lot

  7. Under 12 months

    Construction

    Foundations to finishes on a set schedule, with weekly site walks and photo updates.

    You receiveWeekly updates from site

  8. Move-in day

    Keys

    A full walkthrough, your home manual and warranty paperwork, and the keys from Sami.

    You receiveYour new home

Cost

What drives the budget.

Size and finishes set most of the cost. The lot sets the rest.

  • Size and shape. Above-grade area drives most of the budget; complex roofs and long spans add to it.
  • Finish level. Kitchens, millwork, windows and stone can move the cost per square foot by $100 or more.
  • The basement. Finished lower levels cost less per square foot, but walk-outs, deep excavation and underpinning add up.
  • The site. Grading, shoring beside neighbours, high water tables, tree protection and long service runs.
  • Approvals. A minor variance, arborist reports or a conservation authority permit add fees and time.
  • Demolition and services. Hazardous materials in older homes, disconnections and new water, sewer and hydro connections.

Typical budget: 3,200 sq ft home with a finished basement

ItemLowHigh
Construction: 3,200 sq ft at $330 to $500 per sq ft$1,056,000$1,600,000
Finished basement: about 1,600 sq ft at 35% of the rate$185,000$280,000
Design, engineering, permits and fees (8%)$99,000$150,000
Contingency (5 to 10%)$62,000$188,000
Demolition and disconnections$25,000$45,000
Site services and connections$20,000$60,000
Typical total, rounded$1.45M$2.32M

Indicative 2026 figures from Oaksmith’s cost model, before land and HST. Your Lot Check prices your lot and your plans; your proposal prices your design line by line.

Building in 2026? Ontario’s temporary HST relief for homes built on your own lot depends on starting construction by March 31, 2027. Read what qualifies.

Recent homes

Built for how families live now.

Three-storey modern infill home with a stone and grey stucco front, black windows and a single garage, beside a matching home
The Oak & Skylark · three-storey infillSee the home
Open kitchen with white slab upper cabinets, oak-grain lower cabinets and a quartz waterfall island wrapped in oak slats
The Oak & Hush · open main floorSee the home

When you build with Oaksmith, you have my number from day one. I review every drawing, I walk your site every week, and I hand you the keys myself.

Sami RafeehPresident, Oaksmith Homes

Questions

About rebuilding.

Ask a question
Do I need a demolition permit?

Yes. Most GTA cities issue the demolition permit for a replacement home together with, or after, the building permit for the new house, so a lot isn’t left empty. We apply for both together.

Where do we live during construction?

Most families rent nearby. Because our builds run under 12 months from permit to keys, you can plan the lease around a firm schedule.

Can we keep the old foundation?

Sometimes, but it rarely pays. Old foundations limit the design and the basement height, and new footings, waterproofing and drainage are hard to add later. We’ll tell you honestly if reuse makes sense.

What about the trees?

Larger private trees are protected in most GTA cities. An arborist report sets out what can stay, how it’s protected during the build, and whether a permit is needed to remove any.

Can I add a rental or in-law suite?

Usually, yes. Ontario allows up to three units on most urban lots, and several GTA cities allow four or more. A suite can also help with financing.

How much does a knockdown rebuild cost?

For a 3,200 sq ft home with a finished basement, a typical all-in budget runs about $1.45M to $2.32M before land and HST. Your Lot Check gives a range for your lot and your plans.

Start with your lot

What fits on your lot?

Send the address for a free Lot Check: zoning, what you can build, approvals, a budget range and a timeline, within two business days.

  • Free and no obligation
  • Reviewed by Sami personally
  • The first step to a site walk

Request your free Lot Check.

Send the address and a line about your plans. Sami reviews every request and sends your one-page Lot Check within two business days. Fields marked * are required.

The lot
Your project *

Free and no obligation. See our privacy notice.

Free Lot Check